Expertise
Cabling and patching in data centres
Cabling is the most visible part of a data centre engineer’s craft: one look at the back of a rack tells you everything. Full Connection carries out cabling, patching and patch cord installation in data centres to the standard of finish and documentation that national operators demand. We have worked on their sites for nine years.
Our daily work
- Optical fibre
Pulling and termination of single-mode, multimode and MPO/MTP — power-meter testing, OTDR testing on request.
- Copper
Cat6 / 6A / 8: pulling, termination, link certification.
- Patch cord installation
In meet-me rooms and patching rooms, patching between racks and within racks.
- Commissioning
Servers, switches, routers, cache servers — installation and checks.
- Tidy-up
Rework of existing racks, standardised labelling, up-to-date patching records.
- Extensions
Creating and extending links between rooms.

Working in other people’s facilities, properly
A colocation data centre has its own rules: access procedures, maintenance windows, reports expected by the operator. Our teams follow them every day in France’s major colocation sites — badges, site instructions, room routines. You entrust us with an intervention; the operator sees an engineer who already knows the site.
From a single task to recurring work
We handle one-off interventions (one patch cord to install, one server to rack, one link to test) as well as recurring campaigns: multi-rack deployments, commissioning waves, and smart hands contracts for customers with no local team. Every intervention, even the shortest, comes with a documented report, with photos of your rack, in line with the site’s photo policy.
What clean patching means
Cords at the right length, with no slack loops hanging. Bend radius respected on fibre. Copper and fibre kept apart, power cabling away from data cabling. Cable bundles neatly dressed and secured with ties that do not crush the cables. A legible label at each end. And a patching plan updated the same day: it is what lets the next engineer work without unplugging anything by mistake.
Acceptance testing and documentation delivered
- Fibre measurements
Power-meter and OTDR testing, according to your specification.
- Copper certification
Certification of Cat6, Cat6A and Cat8 links according to your specification.
- Patching plan
Up-to-date link table, port by port, handed over at the end of the intervention.
- Before and after photos
Your rack photographed before and after, included in the report, in line with the site’s photo policy.
Test equipment and standards
- Test equipment
Optical time-domain reflectometer (Viavi MTS-4000), power meters and light sources (LED for multimode, laser for single-mode), visual fault locator (red laser pen), connector inspection microscope, RJ45 testers and copper cabling certifier.
- Reference standards
ISO/IEC 11801 and EN 50173 for cabling, IEC 61300-3-35 for optical connector inspection, ISO/IEC 14763-3 for optical cabling testing.
Content written by the Full Connection field team and approved by Karim Bouacida, head of the company.
Frequently asked questions
What is the difference between cabling, patching and patch cord installation?
Cabling lays the permanent links between racks, rooms and distribution frames. Patching connects equipment to patch panels with short cords. Patch cord installation is the fitting of those optical cords on a distribution frame, notably in a meet-me room.
Do you take over a badly cabled rack that is still in production?
Yes. The tidy-up is done link by link, in an approved window, after a full survey and with a rollback plan.
Do you work in every data centre?
Based in Paris and Aix-en-Provence, we work across Île-de-France, the South of France (from Béziers to Nice) and the Hauts-de-France, and we will consider any request elsewhere in France — large data centres, regional rooms, hard-to-reach sites. If your equipment is hosted by an operator, we comply with its access procedures.
What is the lead time for a simple intervention?
For a single task (patching, patch cord installation, replacement), the lead time is agreed with you, depending on the site and its access rules.
Do you supply patch cords and consumables?
Yes, in copper and fibre, to the references approved in your specification — or we install your own.
An intervention to plan in a data centre?
Describe the site, the window and the objective.