Expertise

Data centre relocation and rack migration

Changing hosting provider, leaving a room at the end of a lease, consolidating two sites: a data centre relocation is won or lost before the day itself. Full Connection plans and carries out the transfer of your racks and equipment between data centres, computer rooms and server rooms, using the methods of France’s most demanding networks.

Are you relocating your company’s computer room or server room? See: computer room relocation

Cutover — departure site to arrival site

A three-step method

  1. Step 1Prepare

    Rack-by-rack inventory, survey of every link, labelling before disconnection, layout and patching plan for the destination site, pre-cabling of the target room, cutover schedule and rollback plan.

  2. Step 2Cut over

    Controlled shutdown, de-cabling, removal, packing of sensitive equipment, secure transport, reassembly in the planned order. In waves when services must stay live.

  3. Step 3Sign off

    Link-by-link tests, checks with your teams before return to operations, and an acceptance pack with an updated patching plan and photos of your rack, where the site’s photo policy allows.

Closed glass containment doors in front of an aisle of racks
Contained aisle — before interventionField photo

The relocations we handle

  • From one data centre to another

    Change of operator or colocation site, rack by rack or a complete cage.

  • From your room to colocation

    Moving a corporate server room into a data centre.

  • Within the same site

    Change of room, cage or private suite, rack moves.

  • Consolidation

    Several rooms or several sites brought together into one.

Migrate with no outage, or with an outage you choose

A migration with no outage is prepared well in advance: destination site pre-cabled, temporary links between the two sites, cutover in waves, service by service. When downtime is unavoidable, it is placed in the maintenance window you choose (night, weekend), kept to a minimum and covered by a rollback plan. We have carried out these operations for national telecom operators, where interruption is not negotiable.

In operators’ facilities, by their rules

Equinix, Data4, Digital Realty, Telehouse, Global Switch: our teams work on these operators’ sites and follow their access procedures, maintenance windows and delivery rules. At both departure and arrival, the operator gets an engineer who already knows the site.

The old space, handed back clean

The relocation does not end when the last server leaves. We remove the cabling and racks left behind, dispose of what is no longer needed and hand back a room, cage or suite ready for the exit inspection.

What an outage costs

57% of respondents to Uptime Institute’s annual survey say their most recent major outage cost them more than $100,000. One in five reports more than $1 million. A relocation is when that risk is at its most concentrated: every rack disconnected is an outage you have chosen. That is why the schedule is built backwards from your acceptable downtime window, and why every link is tested before it goes back into service.

Source: Uptime Institute, Annual Outage Analysis 2026 (published 13 May 2026, 2025 survey)

Content written by the Full Connection field team and approved by Karim Bouacida, head of the company.

Frequently asked questions

  • How long does a data centre relocation take?

    The cutover itself often fits into one night or one weekend per wave. Preparation takes weeks: inventory, link survey, pre-cabling of the destination site and scheduling.

  • Can we migrate with no service outage?

    Yes, where the architecture allows it: redundancy, temporary links between the two sites, cutover in waves. Otherwise the outage is scheduled in your window, kept to a minimum and covered by a rollback plan.

  • Do you work if we are tenants in a colocation data centre?

    Yes. We follow the operator’s access procedures and work in your rack, cage or private suite, at both departure and arrival.

  • Do you handle the transport of equipment?

    Yes: packing suited to sensitive equipment, secure transport and traceability of every item, from the departure rack to the destination rack.

A data centre to relocate, racks to migrate?

Let’s talk method before we talk dates.

By phone: 07 76 31 97 87