Expertise
Data centre and server room decommissioning
End of a colocation lease, closure of a room, hardware refresh: a badly run decommissioning means live links cut by mistake, equipment that cannot be found and premises rejected at the handover inspection. Full Connection removes your equipment, inventories it, takes it away and hands back clean space, in data centres, computer rooms and server rooms.
A three-step method
- Step 1Inventory
A survey of every item of equipment and every link, with the live services identified and a list agreed with you before anything is cut.
- Step 2Remove
Orderly shutdown, de-cabling, removal of equipment, racks and cabling, then packing and removal from site.
- Step 3Hand back
Spaces cleaned and restored, handover inspection, and an end-of-job file with the inventory and photos of the space, in line with the site’s photo policy.
What we remove
- Servers, storage, network
Removal of active equipment, rack by rack, with serial numbers recorded.
- Racks and enclosures
Dismantling, removal and restoration of the spaces.
- Copper and fibre cabling
Patch cords, patch panels, optical trays, inter-rack links.
- Telecom operator equipment
Transmission, IP, radio: where we started.
Cut only what has to be cut
In a room that is still live, the risk is removing the wrong link. Every cable is traced end to end and identified before it is removed; whatever stays in service is marked and protected. Work is done in an agreed maintenance window, with a rollback plan.
Data, reuse, recycling
Data storage media are handed to your security team, or wiped to your procedure by the provider you name, with traceability by serial number. Equipment is inventoried and sorted with you: anything that can be reused is returned to you or reassigned to another site, and the rest goes to a recycling channel.
What you receive at the end of the job
- Photo report
Before and after photos of your rack, in line with the site’s photo policy, so that you have a record of the state of the space before removal and after it has been cleaned and restored.
- Inventory
Every item removed, with its reference and serial number.
- Signed handover note
For equipment returned to you: what comes back to you is listed and signed for at handover.
- Collection note and waste transfer slip
Collection note and acceptance slip from the collector or the approved treatment centre (WEEE), in your company’s name, for your waste register.
- Updated plans and patching plan
Room plans and the patching plan corrected for what has been removed, so that the links left in service remain documented.
- Data storage media
List of drives by serial number, with a handover note signed by your security team, or a certificate of erasure or destruction from the provider you name.
- Cross-connects and exit
List of cross-connects to be terminated with the operator, and an exit report signed with them.
From national programmes to corporate rooms
Full Connection has taken part in nationwide deployment and decommissioning programmes on behalf of national carriers, including at hard-to-reach sites. The same method applies to a colocation cage in Saint-Denis, a head-office server room in Paris or a technical room in the regions.
Content written by the Full Connection field team and approved by Karim Bouacida, head of the company.
Frequently asked questions
How long does a decommissioning take?
From a few hours for a single rack to several weeks for a full room. The preliminary inventory sets the schedule before anything is cut.
Can you decommission part of a room without stopping the rest?
Yes. The links and equipment to be kept are identified and protected before removal, and the work is done in an agreed maintenance window.
What happens to the equipment you remove?
It is inventoried and sorted with you: returned, reassigned to another site or sent for recycling.
What happens to drives and data storage media?
They are handed to your security team, or wiped to your procedure by the provider you name, with traceability by serial number.
Do you work at the end of a colocation contract?
Yes: we clear your rack, cage or suite following the operator’s procedures and prepare the exit inspection.
A room, a cage or racks to clear?
Describe the site, the window and the objective.
By phone: 07 76 31 97 87