Services

Field services for critical infrastructure

From design to decommissioning: the lifecycle of your infrastructure in six stages, from the data centre to the server room and the remote site.

Expertise

Rooms, migrations and cabling

Nine field needs, documented the way we work — from the room plan to decommissioning, in Paris and Île-de-France.

A link between two customers in the same data centre: the cross-connect explained.

Intervention cross-section

From scoping to handover

A day on site, read as a technical cross-section — from briefing to rack, through to handover.

BRIEF · ACCESS · WINDOW · CRITICALITYTECHNICAL ROOM · 42U RACKFILE · MINUTES · HANDOVER

A context to scope?

Describe the site, the constraints, the maintenance window and the objective. Full Connection replies with a view focused on feasibility, intervention and continuity.