LOA-CFA
A LOA-CFA is the written authorisation that names a port and allows a third party to connect to it. It is issued by the data centre or by the tenant that controls the port, then submitted to the data centre when a cross-connect is ordered. Without it, nobody installs.
From LOA-CFA to ordered cross-connect
- Step 1Issue
Whoever controls the port, the data centre or the tenant, draws up the LOA-CFA: it names the panel and port to use and the party authorised to connect to it.
- Step 2Submit
The LOA-CFA is submitted to the data centre with the cross-connect order. It tells the operator where to connect, and confirms that the port holder agrees.
- Step 3Check
Before patching, the panel and port identified on site are compared with those on the LOA-CFA. Any discrepancy is reported before anything is connected.

What a LOA-CFA contains
- The port holder
The data centre or tenant that controls the port and gives the authorisation.
- The authorised party
The company entitled to connect to this port.
- The panel and port
The exact location, as labelled in the room.
- The site and room
The data centre, and the room or rack concerned.
Why nothing is installed without it
A port belongs to someone. Connecting a cross-connect to the wrong port, or to a port whose holder has authorised nothing, can cut another customer’s link. The operator therefore requires this written document before installing: it records who authorises what, and on which port.
LOA-CFA and cross-connect
The LOA-CFA does not replace the order: it accompanies it. The cross-connect itself is the link installed between the two panels; the LOA-CFA is the document that authorises it.
In the data centre
Reading the LOA-CFA, locating the panel and port on site, inspecting and cleaning connectors, connecting, labelling: this is our daily work in Île-de-France data centres. Every intervention, however short, is followed by a documented report, with photos of your rack, in line with the site’s photo policy.
Content written by the Full Connection field team and approved by Karim Bouacida, head of the company.
Frequently asked questions
What does LOA-CFA stand for?
Letter of Authorization – Connecting Facility Assignment. The letter of authorisation that names the port a third party may connect to.
Who issues the LOA-CFA?
The data centre, or the tenant that controls the port. It is the authorisation of whoever has control of the port.
Who should receive it?
The data centre, with the cross-connect order.
Does the LOA-CFA replace the cross-connect order?
No. The order is placed with the data centre operator. The LOA-CFA accompanies it: it shows that the port holder authorises the connection.